SwRI: ASTM D5598 Port Fuel Injector Deposit Procedure
| |
 |
| |
Today's unleaded gasolines have been developed to virtually
eliminate the formation of harmful deposits on fuel injectors, but fuels vary in
their ability to control deposits on intake valves and in combustion chambers. |
The ASTM D5598 Port Fuel Injector (PFI) Deposit Procedure
evaluates the tendency of a gasoline to keep the port fuel injectors clean.
Port Fuel Injector Deposit Test Procedure
A
1985-87 Chrysler 2.2-L turbocharged engine with an automatic
transmission is used for this procedure. The test cycle consists
of:
-
F55 miles per hour for 15 minutes
-
Engine off, hot-soak for 45 minutes
-
Flow test injectors every 1,000 miles for a
total test length of 10,000 miles
The fuel requirement for this test is
500 gallons, and the duration is 40 days. The PFI test is a
pass if the fouling of all injectors remains 5% or less for
the entire test.
A modified version of this procedure is available to evaluate the
tendency of a gasoline to clean fouled port fuel injectors.
The procedure for this test is as follows:
| |
 |
| |
 |
| |
(top) Clean-up phase;
(bottom) Dirty-up phase |
-
For the dirty-up phase, run 15/45
cycle, and flow test until at least one injector is
fouled to greater than 10%.
-
For the clean-up phase, run 15/45
cycle, and flow test until fuel injector fouling is 5%
or less.
Clean-up is confirmed when the fouling
of all four injectors becomes 5% or less.
For more information about ASTM D5598 port fuel injector
deposit procedure capabilities at SwRI or how you can contract
with SwRI, please contact
Kevin Brunner at
kbrunner@swri.org or (210) 522-3579, or contact
Frank Stains at
fstains@swri.org or (210) 522-5984.
©1998-2009 Copyright Southwest Research Institute
Printed from:
http://www.swri.edu/4org/d08/Driveline/pfidtest/default.htm?
Southwest Research Institute®
(SwRI®) is an independent, nonprofit, applied engineering and physical
sciences research and development organization with
12 technical divisions
using multidisciplinary approaches to problem solving. The Institute occupies
more than
1,200 acres and provides
nearly two million square feet of laboratories, test facilities, workshops, and offices for more than
3,300
employees who perform contract work for industry and government clients.
|