![]() |
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
The Sequence VG test evaluates a lubricant's ability to prevent sludge and varnish formation.
Sequence VG Test Equipment and ProcedureA 2000 Ford 8-cylinder, 4.6-liter fuel-injected gasoline engine, with roller followers, coolant-jacketed rocker covers, and camshaft baffles is used. This 216-hour test involves 54 cycles, each cycle consisting of three differing operating specifications or stages.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
PARAMETER |
PASS LIMIT |
|
Average engine sludge, minimum |
7.8 |
|
Rocker cover sludge, minimum |
8.0 |
|
Average engine varnish, minimum |
8.9 |
|
Piston skirt varnish, minimum |
7.5 |
|
Oil screen clogging, % maximum |
20 |
|
Hot stuck compression rings |
None |
|
Oil screen debris |
Rate & report |
|
Oil ring clogging |
Rate & report |
|
Cold stuck rings |
Rate & report |
|
Follower pin wear, avg. |
Rate & report |
|
Ring gap increase, avg. |
Rate & report |
For more information about the
Sequence VG procedure capabilities at
Southwest Research Institute (SwRI) or how you can contract with SwRI,
please contact
Dan Worcester at
dworcester@swri.org or (210) 522-2405.
|
Contact Information |
|
Sequence VG Procedure (210) 522-2405 |
|
Related Terminology |
|
Sequence VG test API SL API SM ILSAC GF-3 ILSAC GF-4 lubricant sludge varnish engine blowby oil pump screen clogging piston oil rings |
|
Related Information |
| Engine Lubricants Research Department | Fuels and Lubricants Research Division | SwRI Home |
Southwest Research Institute® (SwRI®), headquartered in San Antonio, Texas, is a multidisciplinary, independent, nonprofit, applied engineering and physical sciences research and development organization with 11 technical divisions.
September 30, 2008